This new church was a joint effort, built over a period of four weeks. The Calimesa, Calif., group prepared the slab last fall; the Show Low, Ariz., group started the walls; the Stone Tower (Portland, Ore.) Church group along with groups from the Riverside (Washougal, Wash.) Church and Priest River, Idaho, finished the walls. The Grand Ronde, Ore., group put the roof on. Smaller groups from Oregon's Boring, Nestucca and McMinnville areas also participated. Lloyd Logan, Stone Tower pastor, coordinated the project, which took place during spring break in March and included a Vacation Bible School for more than 50 children. The first baptism took place in the new baptistry before the roof was on.
Section